{"id":21784,"date":"2025-05-07T14:56:38","date_gmt":"2025-05-07T07:56:38","guid":{"rendered":"https:\/\/zodiac.com.vn\/chief-tiled-mounting-solution-enhances-display-experience-at-astara-headquarters\/"},"modified":"2026-04-11T15:40:53","modified_gmt":"2026-04-11T08:40:53","slug":"chief-tiled-mounting-solution-at-astara","status":"publish","type":"post","link":"https:\/\/zodiac.com.vn\/en\/chief-tiled-mounting-solution-at-astara\/","title":{"rendered":"Chief TiLED mounting solution enhances display experience at Astara headquarters"},"content":{"rendered":"<p data-start=\"130\" data-end=\"306\">Discover how the <strong data-start=\"147\" data-end=\"190\">Chief TiLED mounting system from Legrand | AV<\/strong> provided an advanced, precise solution to a complex installation challenge at Astara\u2019s headquarters in Switzerland.<\/p>\n<h2><strong>Challenge<\/strong><\/h2>\n<article dir=\"auto\" data-testid=\"conversation-turn-68\" data-scroll-anchor=\"true\">\n<p data-start=\"0\" data-end=\"300\">Astara is one of the world\u2019s leading smart mobility corporations, operating in 19 countries worldwide. At its new headquarters lobby in Wallisellen, Switzerland, Astara has invested in an impressive <a href=\"https:\/\/zodiac.com.vn\/en\/system-integration\/large-display-screen\/\">large-format LED display system<\/a>, aiming to transform the space into a dedicated customer experience center.<\/p>\n<p>However, the primary challenge did not stem from the LED display technology itself, but rather from the structural conditions of the mounting surface. The displays were to be installed on custom-built wooden walls, which introduced significant technical concerns:<\/p>\n<\/article>\n<ul>\n<li data-start=\"862\" data-end=\"970\">\n<p data-start=\"864\" data-end=\"970\"><strong data-start=\"864\" data-end=\"899\">Inconsistent flatness and depth<\/strong> pose difficulties for accurate installation and visual alignment.<\/p>\n<\/li>\n<li data-start=\"971\" data-end=\"1080\">\n<p data-start=\"973\" data-end=\"1080\"><strong data-start=\"973\" data-end=\"1006\">Limited load-bearing capacity<\/strong>, with structural stability that could not be fully guaranteed in advance.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"1082\" data-end=\"1325\">Given these conditions, the team needed a <a href=\"https:\/\/avcenter.vn\/collections\/gia-treo-man-hinh\" target=\"_blank\" rel=\"noopener\"><strong data-start=\"1124\" data-end=\"1154\">flexible mounting solution<\/strong><\/a>\u2014one that could accommodate uneven surfaces, allow <strong data-start=\"1205\" data-end=\"1245\">precise 3-axis (X, Y, Z) adjustments<\/strong>, and streamline the installation process without compromising system integrity.<\/p>\n<h2>Chief TiLED mounting solution \u2013 Ideal for complex surfaces<\/h2>\n<p data-start=\"1400\" data-end=\"1559\">After detailed site evaluation and technical review, the implementation team selected <strong data-start=\"1486\" data-end=\"1501\">Chief TiLED<\/strong>, a premium dvLED mounting system from <strong data-start=\"1540\" data-end=\"1556\">Legrand | AV<\/strong>.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/de-dang-lap-dat-giai-phap-gia-treo-led-legrandav-1024x768.jpg\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" srcset=\"https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/de-dang-lap-dat-giai-phap-gia-treo-led-legrandav-1024x768.jpg 1024w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/de-dang-lap-dat-giai-phap-gia-treo-led-legrandav-300x225.jpg 300w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/de-dang-lap-dat-giai-phap-gia-treo-led-legrandav-768x576.jpg 768w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/de-dang-lap-dat-giai-phap-gia-treo-led-legrandav-1536x1152.jpg 1536w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/de-dang-lap-dat-giai-phap-gia-treo-led-legrandav-600x450.jpg 600w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/de-dang-lap-dat-giai-phap-gia-treo-led-legrandav-200x150.jpg 200w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/de-dang-lap-dat-giai-phap-gia-treo-led-legrandav.jpg 1920w\" alt=\"de-dang-lap-dat-giai-phap-gia-treo-led-legrandav\" width=\"800\" height=\"600\" \/><br \/>\n<img decoding=\"async\" src=\"https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/Astara_giai-phap-gia-treo-chief-LED-1024x768.jpg\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" srcset=\"https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/Astara_giai-phap-gia-treo-chief-LED-1024x768.jpg 1024w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/Astara_giai-phap-gia-treo-chief-LED-300x225.jpg 300w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/Astara_giai-phap-gia-treo-chief-LED-768x576.jpg 768w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/Astara_giai-phap-gia-treo-chief-LED-1536x1152.jpg 1536w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/Astara_giai-phap-gia-treo-chief-LED-600x450.jpg 600w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/Astara_giai-phap-gia-treo-chief-LED-200x150.jpg 200w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/Astara_giai-phap-gia-treo-chief-LED.jpg 1920w\" alt=\"\" width=\"800\" height=\"600\" \/><\/p>\n<p data-start=\"0\" data-end=\"56\"><strong data-start=\"0\" data-end=\"56\">Key highlights of the Chief TiLED mounting solution:<\/strong><\/p>\n<ul>\n<li data-start=\"58\" data-end=\"183\">\n<p data-start=\"60\" data-end=\"183\"><strong data-start=\"60\" data-end=\"106\">Three-axis precision adjustment (X, Y, Z):<\/strong> Ensures seamless LED module alignment with no pixel shift or visible gaps.<\/p>\n<\/li>\n<li data-start=\"184\" data-end=\"350\">\n<p data-start=\"186\" data-end=\"350\"><strong data-start=\"186\" data-end=\"227\">Versatile installation compatibility:<\/strong> Adapts to a wide range of surfaces\u2014including wood, concrete, and metal\u2014without requiring major structural modifications.<\/p>\n<\/li>\n<li data-start=\"351\" data-end=\"470\">\n<p data-start=\"353\" data-end=\"470\"><strong data-start=\"353\" data-end=\"389\">Optimized installation workflow:<\/strong> Significantly reduces setup time while minimizing potential installation errors.<\/p>\n<\/li>\n<\/ul>\n<p data-start=\"472\" data-end=\"659\">With full adjustability, the Chief TiLED mounting system allows integrators to effectively address construction variances, delivering unmatched precision for dvLED video wall deployments.<\/p>\n<h2>Result: A striking technological statement at Astara\u2019s Headquarters lobby<\/h2>\n<article dir=\"auto\" data-testid=\"conversation-turn-62\" data-scroll-anchor=\"false\">\n<p data-start=\"749\" data-end=\"1018\">Upon completion, the LED display system at Astara\u2019s headquarters lobby emerged as a signature visual feature, both architecturally and functionally. The experience center now delivers a powerful visual impact, enhancing the overall brand presence and visitor engagement.<\/p>\n<\/article>\n<p><img decoding=\"async\" src=\"https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/giai-phap-gia-treo-Chief-Zodiac-1024x768.jpg\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" srcset=\"https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/giai-phap-gia-treo-Chief-Zodiac-1024x768.jpg 1024w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/giai-phap-gia-treo-Chief-Zodiac-300x225.jpg 300w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/giai-phap-gia-treo-Chief-Zodiac-768x576.jpg 768w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/giai-phap-gia-treo-Chief-Zodiac-1536x1152.jpg 1536w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/giai-phap-gia-treo-Chief-Zodiac-600x450.jpg 600w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/giai-phap-gia-treo-Chief-Zodiac-200x150.jpg 200w, https:\/\/zodiac.com.vn\/wp-content\/uploads\/2025\/05\/giai-phap-gia-treo-Chief-Zodiac.jpg 1920w\" alt=\"giai-phap-gia-treo-Chief-Zodiac\" width=\"800\" height=\"600\" \/><\/p>\n<blockquote>\n<p data-start=\"0\" data-end=\"334\"><strong data-start=\"55\" data-end=\"334\"><i>\u201cThe installation of the LED wall with the Chief TiLED mounts was an entirely positive experience. The system is well-designed and straightforward to set up, which significantly sped up the entire process. We would choose this solution again anytime.\u201d<\/i><\/strong><\/p>\n<p>&#8211; Mr. Ricco H\u00e4sler, team-lead installation &#8211;<\/p>\n<p data-start=\"336\" data-end=\"846\"><strong data-start=\"409\" data-end=\"846\" data-is-last-node=\"\"><i>\u201cThe end-result is perceived as an impressive and standout feature of our Swiss office, enhancing the overall experience for visitors of Astara. The installation has been used effectively as an experience center, with the LED walls providing a high-quality visual display. The exclusive setup received positive feedback from employees and guests who visit Astara and the Astara lounge as customers or at brand events.\u201d<\/i><\/strong><\/p>\n<p data-start=\"336\" data-end=\"846\">&#8211; Ivan Filipov, IT Director Central Europe of Astara.\u00a0&#8211;<\/p>\n<\/blockquote>\n<p><a href=\"https:\/\/www.legrandav.com\/resources\/360_product_overviews\/tiled-dvled-mounting-solutions\" target=\"_blank\" rel=\"noopener\"><strong>Chief TiLED by Legrand | AV<\/strong><\/a> is not only a flexible and highly precise <strong>LED mounting solution<\/strong>, but also sets a new installation standard for <strong>premium experience centers<\/strong>, <strong>control rooms<\/strong>, and <strong>professional brand display environments<\/strong>.<\/p>\n<p><strong>Zodiac<\/strong> is the official partner of <strong>Legrand | AV in Vietnam<\/strong>. Contact us for tailored consultation and technical support.<\/p>\n<p><em>Source: LegrandAV<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Discover how the Chief TiLED mounting system from Legrand | AV provided an advanced, precise solution to a complex installation challenge at Astara\u2019s headquarters in Switzerland. Challenge Astara is one of the world\u2019s leading smart mobility corporations, operating in 19 countries worldwide. At its new headquarters lobby in Wallisellen, Switzerland, Astara has invested in an [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":21770,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[139],"tags":[],"class_list":["post-21784","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-technology-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/posts\/21784","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/comments?post=21784"}],"version-history":[{"count":1,"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/posts\/21784\/revisions"}],"predecessor-version":[{"id":22298,"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/posts\/21784\/revisions\/22298"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/media\/21770"}],"wp:attachment":[{"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/media?parent=21784"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/categories?post=21784"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zodiac.com.vn\/en\/wp-json\/wp\/v2\/tags?post=21784"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}